License #YCYC.01569 · LITCHFIELD, CT · Capacity —
8 total deficiencies
8 citations across this facility's inspection history. Top 8 below — click any rule to read the plain-English summary, evidence inspectors look for, and how to fix.
| Rule | Times cited | Sample narrative |
|---|---|---|
19a-428-4(l)
|
1 | Fields intended for athletic activities or use shall be maintained free of hazards. — 045-Fields |
19a-428-4(m)
|
1 | The waterfront and aquatic activities shall be laid out and conducted in accordance with training relating to water safety and small craft safety offered by the American Red Cross or its equivalent, as determined by the … |
19a-428-4(n)
|
1 | Any amusement ride or devise shall meet the requirements of the Connecticut General Statutes. — 047-Amusement rides |
19a-428-4(d)
|
1 | The method of final sewage or refuse disposal utilized in connection with the operation of a youth camp shall not create a nuisance and shall conform with the requirements of the Regulations of Connecticut State Agencies… |
19a-428-4(e)
|
1 | The plumbing systems in each youth camp shall conform with the requirements of the Regulations of Connecticut State Agencies. — 036-Plumbing |
19a-428-4(g)
|
1 | Supervision and equipment sufficient to prevent littering of the grounds with rubbish, garbage or other refuse shall be provided and maintained. Fly tight depositories for such material shall be provided and conspicuousl… |
19a-428-4(j) and 19a-428-4(j)(l)
|
1 | The youth camp site shall be owned by the licensee or the licensee shall have a written lease to use the site as a youth camp. The location of the youth camp shall be such as to supply adequate drainage of all areas occ… |
19a-428-2t(1)
|
1 | The licensee shall comply with the requirements pertaining to staff comprehensive background checks. A file shall be kept on the licensed premises for each employee of the youth camp which shall include evidence that the… |
↑ Each rule code links to its CT most-cited rules breakdown — director-friendly summaries with evidence checklists.
Sign up to get this facility's full 0-1000 Risk Score across 8 weighted compliance components — citation history, evidence completeness, drill compliance, mock inspection scores, and more.
Unknown source cadence · Retrieved by AccreditReady May 12, 2026 · Source: Connecticut Office of Early Childhood