License #DCCC.70744 · MIDDLETOWN, CT · Capacity —
52 total deficiencies
52 citations across this facility's inspection history. Top 10 below — click any rule to read the plain-English summary, evidence inspectors look for, and how to fix.
| Rule | Times cited | Sample narrative |
|---|---|---|
19a-79-4a(a)(1) and/or 19a-79-4a(a)(2)
|
3 | A file shall be kept on the licensed premises for each employee of the child care center or group child care home which shall include an acceptable medical statement and a written report of a negative tuberculin test. — … |
19a-79-4a(e)(2) and/or 19a-79-4a(f)
|
3 | At all times the child care center or group child care home is in operation, there shall be present at least one (1) staff member who has successfully completed within the past three years an Office of Early Childhood ap… |
19a-79-4a(h)(2)(G)
|
3 | A written plan for consultation services shall be developed, signed annually by the consultant and implemented. Consultative services shall include documenting the activities and observations in a consultation log that i… |
19a-79-3a(b)(6)
|
2 | The operator shall require participation by new program staff in employee orientation. — 004-Employee orientation for new program staff |
19a-79-7a(g)
|
2 | All equipment shall be of such design and material as to be readily cleaned and safe for children. Equipment shall not be colored or covered by any poisonous material. Equipment shall be sturdy, safely constru… |
19a-79-5a(a)(2)(E)
|
2 | The operator of a child care center or group child care home is responsible for maintaining on the licensed premises a current record for each child enrolled. A copy of the record shall be available and provided upon req… |
19a-6a(c) and/or 19a-6a(d)
|
2 | The facility shall maintain at least one (1) portable, readily available first aid kit wherever children are in care, including field trips, outdoor play areas and one to remain at the facility if all the children do not… |
19a-79-7a(e)(5)
|
2 | Walls, ceilings, floors and rugs shall be maintained in a state of good repair and be washable or easily cleanable. — 069-Walls/Ceilings/Floors/Rugs: Clean/Good Repair |
19a-79-7a(e)(10)
|
2 | Potentially hazardous substances in the child care centers and group child care homes shall be stored in a separate locked area. — 076-Potentially Hazardous Substances Locked |
19a-79-7a(g)(4) and/or 19a-79-7a(h)
|
2 | Hardware such as air conditioners, water heaters or fuse boxes shall be inaccessible to children. The playground shall be free of glass, debris, holes and other hazards. — 089-Playground Free From Hazards |
↑ Each rule code links to its CT most-cited rules breakdown — director-friendly summaries with evidence checklists.
Sign up to get this facility's full 0-1000 Risk Score across 8 weighted compliance components — citation history, evidence completeness, drill compliance, mock inspection scores, and more.
Unknown source cadence · Retrieved by AccreditReady May 11, 2026 · Source: Connecticut Office of Early Childhood