License #DCCC.70508 · EAST HAVEN, CT · Capacity —
7 total deficiencies
7 citations across this facility's inspection history. Top 7 below — click any rule to read the plain-English summary, evidence inspectors look for, and how to fix.
| Rule | Times cited | Sample narrative |
|---|---|---|
19a-79-7a(d)(10)(A-H)
|
1 | Where toilets and sinks are shared by children and adults, a written policy shall be developed and implemented that requires supervision of children when using the shared toilet room. Programs shall provide changing and … |
19a-79-7a(d)(4)
|
1 | Any unprotected glass doors, windows or mirrors to which children have access shall be protected to a height of thirty six inches from the floor or surface on which a child stands. — 075- Glass and mirrors protected to 3… |
19a-79-7a(e)(5)
|
1 | Walls, ceilings, floors and rugs shall be maintained in a state of good repair and be washable or easily cleanable. — 069-Walls/Ceilings/Floors/Rugs: Clean/Good Repair |
19a-79-7a(g)
|
1 | All equipment shall be of such design and material as to be readily cleaned and safe for children. Equipment shall not be colored or covered by any poisonous material. Equipment shall be sturdy, safely constru… |
19a-79-4a(h)(1) and/or 19a-79-4a(h)(2)
|
1 | A written plan for consultation services shall be developed, signed annually by the consultant and implemented. These services shall include an early childhood educational consultant, a health consultant, a dentist or de… |
19a-79-4a(h)(2)(G)
|
1 | A written plan for consultation services shall be developed, signed annually by the consultant and implemented. Consultative services shall include documenting the activities and observations in a consultation log that i… |
19a-79-4a(b)
|
1 | A file shall be kept on the licensed premises for each employee of the child care center or group child care home which shall include evidence that the necessary information and documentation specified by the Office of E… |
↑ Each rule code links to its CT most-cited rules breakdown — director-friendly summaries with evidence checklists.
Sign up to get this facility's full 0-1000 Risk Score across 8 weighted compliance components — citation history, evidence completeness, drill compliance, mock inspection scores, and more.
Unknown source cadence · Retrieved by AccreditReady May 11, 2026 · Source: Connecticut Office of Early Childhood