License #DCCC.70268 · MANCHESTER, CT · Capacity —
77 total deficiencies
77 citations across this facility's inspection history. Top 10 below — click any rule to read the plain-English summary, evidence inspectors look for, and how to fix.
| Rule | Times cited | Sample narrative |
|---|---|---|
19a-79-3a(d)(2) thru (8) &/or19a-79-7a(d)(11)(A)
|
5 | The operator shall implement and annually review specific written policies, plans and procedures that include, but not necessarily be limited to discipline, when a child is not picked up as planned, emergencies, supervis… |
19a-79-4a(h)(1) and/or 19a-79-4a(h)(2)
|
4 | A written plan for consultation services shall be developed, signed annually by the consultant and implemented. These services shall include an early childhood educational consultant, a health consultant, a dentist or de… |
19a-79-7a(g)(4) and/or 19a-79-7a(h)
|
4 | Hardware such as air conditioners, water heaters or fuse boxes shall be inaccessible to children. The playground shall be free of glass, debris, holes and other hazards. — 089-Playground Free From Hazards |
19a-79-4a(a)(1) and/or 19a-79-4a(a)(2)
|
3 | A file shall be kept on the licensed premises for each employee of the child care center or group child care home which shall include an acceptable medical statement and a written report of a negative tuberculin test. — … |
19a-79-7a(h)(2)
|
3 | Where swings, seesaws or climbing apparatus are used, the surface in the space shall be protected with a minimum of eight (8) inches of impact absorbing materials. — 088-Impact Absorbing Material under Equipment |
19a-79-6a(a)(2)
|
3 | A nutritionally adequate meal shall be provided by the child care center or group child care home, or the parent(s) whenever a child remains on the premises for five (5) hours or more. Children who stay on the premises l… |
19a-79-9a(a)(2)
|
3 | The written permission of the parent(s) shall be required prior to the administration of the nonprescription topical medication and a medication administration record shall be written in ink and kept on file at the facil… |
19a-79-3a(e)(2)
|
3 | The operator shall post the current fire marshal certificate in a conspicuous place, accessible to the public. — 009-Current Fire Marshal Certificate |
19a-79-4a(h)(2)(G)
|
3 | A written plan for consultation services shall be developed, signed annually by the consultant and implemented. Consultative services shall include documenting the activities and observations in a consultation log that i… |
19a-79-3a(b)(7) &/or 19a-79-4a(3)
|
2 | The operator shall be responsible for the overall management and operation of the child care center or group child care home in accordance with applicable state and local laws and regulations and shall assure annual trai… |
↑ Each rule code links to its CT most-cited rules breakdown — director-friendly summaries with evidence checklists.
Sign up to get this facility's full 0-1000 Risk Score across 8 weighted compliance components — citation history, evidence completeness, drill compliance, mock inspection scores, and more.
Unknown source cadence · Retrieved by AccreditReady May 11, 2026 · Source: Connecticut Office of Early Childhood