KINDERCARE LEARNING CENTERS #301792

License #DCCC.16021 · SHELTON, CT · Capacity —

Lifetime deficiency profile

44 total deficiencies

Top rules cited at this facility

44 citations across this facility's inspection history. Top 10 below — click any rule to read the plain-English summary, evidence inspectors look for, and how to fix.

RuleTimes citedSample narrative
19a-79-7a(e)(5) 5 Walls, ceilings, floors and rugs shall be maintained in a state of good repair and be washable or easily cleanable. — 069-Walls/Ceilings/Floors/Rugs: Clean/Good Repair
19a-79-7a(g)(4) and/or 19a-79-7a(h) 4 Hardware such as air conditioners, water heaters or fuse boxes shall be inaccessible to children. The playground shall be free of glass, debris, holes and other hazards. — 089-Playground Free From Hazards
19a-79-7a(e)(8) &/or 19a-79-7a(e)(9) 3 All spaces occupied by people, equipment within buildings, approaches to buildings and parking lots shall have adequate lighting. — 074-Adequate Lighting: 50/30 Candle Feet
19a-79-7a(e)(3) 3 The water heating equipment shall deliver water at the tap, the temperature of which shall be within a range of sixty (60) degrees Fahrenheit to one hundred fifteen (115) degrees Fahrenheit. It shall have the capacity to…
19a-79-4a(h)(1) and/or 19a-79-4a(h)(2) 2 A written plan for consultation services shall be developed, signed annually by the consultant and implemented. These services shall include an early childhood educational consultant, a health consultant, a dentist or de…
19a-79-4a(d)(1) 2 The child care center or group child care home shall maintain documentation on site that there is a qualified designated director. — 023-Designated Director
19a-79-3a(e)(9) 2 The operator shall post radon test results in a conspicuous place, accessible to the public. — 015-Radon Test
19a-79-6a and/or 19a-79-7a 2 The building, equipment and services shall be maintained in a good state of repair. A maintenance program shall be established that ensures that the interior, exterior and grounds of the building are maintained, kept cle…
19a-79-7a(e)(10) 2 Potentially hazardous substances in the child care centers and group child care homes shall be stored in a separate locked area. — 076-Potentially Hazardous Substances Locked
19a-79-4a(h)(2)(G) 2 A written plan for consultation services shall be developed, signed annually by the consultant and implemented. Consultative services shall include documenting the activities and observations in a consultation log that i…

↑ Each rule code links to its CT most-cited rules breakdown — director-friendly summaries with evidence checklists.

Get the full Risk Score

Sign up to get this facility's full 0-1000 Risk Score across 8 weighted compliance components — citation history, evidence completeness, drill compliance, mock inspection scores, and more.

Unknown source cadence · Retrieved by AccreditReady May 12, 2026 · Source: Connecticut Office of Early Childhood