License #DCCC.15679 · PROSPECT, CT · Capacity —
10 total deficiencies
10 citations across this facility's inspection history. Top 9 below — click any rule to read the plain-English summary, evidence inspectors look for, and how to fix.
| Rule | Times cited | Sample narrative |
|---|---|---|
19a-79-4a(e)(2) and/or 19a-79-4a(f)
|
2 | At all times the child care center or group child care home is in operation, there shall be present at least one (1) staff member who has successfully completed within the past three years an Office of Early Childhood ap… |
19a-79-4a(h)(1) and/or 19a-79-4a(h)(2)
|
1 | A written plan for consultation services shall be developed, signed annually by the consultant and implemented. These services shall include an early childhood educational consultant, a health consultant, a dentist or de… |
19a-79-5a(a)(2)(E)
|
1 | The operator of a child care center or group child care home is responsible for maintaining on the licensed premises a current record for each child enrolled. A copy of the record shall be available and provided upon req… |
19a-79-9a(b)(1) &/or 19a-79-9a(b)(2)
|
1 | Prior to the administration of any medication, the director(s), head teacher(s), program staff or group child care home provider(s) who are responsible for administering the medications shall first be trained by a physic… |
19a-79-4a(a)(1) and/or 19a-79-4a(a)(2)
|
1 | A file shall be kept on the licensed premises for each employee of the child care center or group child care home which shall include an acceptable medical statement and a written report of a negative tuberculin test. — … |
19a-79-3a(e)(5) and/or 19a-79-6a(a)(4)
|
1 | When a child care center or group child care home provides either meals or snacks, menus shall be prepared at least one (1) week in advance, dated and copies posted in a conspicuous place, accessible to the public. Chang… |
19a-79-4a(e)(1) and/or 19a-79-4a(f)
|
1 | At all times the child care center is in operation there shall be present at least one (1) staff member who has current certification in CPR appropriate for all of the children served at the child care center. The child … |
19a-79-7a(a)(3) and/or 19a-79-7a(a)(4)
|
1 | The operator shall comply with any lead management plan established to address previous lead paint identified (indoors). — 047-Lead Management Plan Reviewed |
19a-79-7a(h)(2)
|
1 | Where swings, seesaws or climbing apparatus are used, the surface in the space shall be protected with a minimum of eight (8) inches of impact absorbing materials. — 088-Impact Absorbing Material under Equipment |
↑ Each rule code links to its CT most-cited rules breakdown — director-friendly summaries with evidence checklists.
Sign up to get this facility's full 0-1000 Risk Score across 8 weighted compliance components — citation history, evidence completeness, drill compliance, mock inspection scores, and more.
Unknown source cadence · Retrieved by AccreditReady May 11, 2026 · Source: Connecticut Office of Early Childhood