License #DCCC.15311 · HAMDEN, CT · Capacity —
17 total deficiencies
17 citations across this facility's inspection history. Top 10 below — click any rule to read the plain-English summary, evidence inspectors look for, and how to fix.
| Rule | Times cited | Sample narrative |
|---|---|---|
19a-79-4a(a)(1) and/or 19a-79-4a(a)(2)
|
2 | A file shall be kept on the licensed premises for each employee of the child care center or group child care home which shall include an acceptable medical statement and a written report of a negative tuberculin test. — … |
19a-79-4a(c)(2)
|
1 | There shall be at least two (2) staff eighteen (18) years of age or older on the premises when one (1) or more children are in attendance. The staff shall be available to care for the children. — 020-Two Staff Present |
19a-79-3a(e)(5) and/or 19a-79-6a(a)(4)
|
1 | When a child care center or group child care home provides either meals or snacks, menus shall be prepared at least one (1) week in advance, dated and copies posted in a conspicuous place, accessible to the public. Chang… |
19a-6a(c) and/or 19a-6a(d)
|
1 | The facility shall maintain at least one (1) portable, readily available first aid kit wherever children are in care, including field trips, outdoor play areas and one to remain at the facility if all the children do not… |
19a-79-7a(e)(7)
|
1 | Emergency telephone numbers shall be posted in an area adjacent to the phone — 073-Emergency Numbers Posted |
19a-79-7a(e)(10)
|
1 | Potentially hazardous substances in the child care centers and group child care homes shall be stored in a separate locked area. — 076-Potentially Hazardous Substances Locked |
19a-79-7a(a)(3) and/or 19a-79-7a(a)(4)
|
1 | The operator shall comply with any lead management plan established to address previous lead paint identified (indoors). — 047-Lead Management Plan Reviewed |
19a-79-7a(g)(4) and/or 19a-79-7a(h)
|
1 | Hardware such as air conditioners, water heaters or fuse boxes shall be inaccessible to children. The playground shall be free of glass, debris, holes and other hazards. — 089-Playground Free From Hazards |
19a-79-7a(a)(3) &/or 19a-79-7a(a)(4)
|
1 | The operator shall comply with any lead management plan established to address previous lead paint identified (outdoors). — 091-Lead Management Plan Reviewed |
19a-79-3a(b)(7) &/or 19a-79-4a(3)
|
1 | The operator shall be responsible for the overall management and operation of the child care center or group child care home in accordance with applicable state and local laws and regulations and shall assure annual trai… |
↑ Each rule code links to its CT most-cited rules breakdown — director-friendly summaries with evidence checklists.
Sign up to get this facility's full 0-1000 Risk Score across 8 weighted compliance components — citation history, evidence completeness, drill compliance, mock inspection scores, and more.
Unknown source cadence · Retrieved by AccreditReady May 11, 2026 · Source: Connecticut Office of Early Childhood