BETHEL DAY CARE CENTER

License #DCCC.15061 · BLOOMFIELD, CT · Capacity —

Lifetime deficiency profile

100 total deficiencies

Top rules cited at this facility

100 citations across this facility's inspection history. Top 10 below — click any rule to read the plain-English summary, evidence inspectors look for, and how to fix.

RuleTimes citedSample narrative
19a-79-3a(b)(7) &/or 19a-79-4a(3) 8 The operator shall be responsible for the overall management and operation of the child care center or group child care home in accordance with applicable state and local laws and regulations and shall require participat…
19a-79-4a(h)(1) and/or 19a-79-4a(h)(2) 6 A written plan for consultation services shall be developed, signed annually by the consultant and implemented. These services shall include an early childhood educational consultant, a health consultant, a dentist or de…
19a-79-4a(h)(2)(G) 6 A written plan for consultation services shall be developed, signed annually by the consultant and implemented. Consultative services shall include documenting the activities and observations in a consultation log that i…
19a-79-3a(b)(8)(B) 5 The operator shall document that the techniques used to manage child behaviors in the facility have been discussed with the child's parent(s) prior to enrollment and reviewed as needed during the period of the child's en…
19a-79-4a(a)(3) and/or 19a-79-4a(g) 5 A file shall be kept on the licensed premises for each employee of the child care center or group child care home which shall include documentation of professional development for each program staff person who cares for …
19a-79-10(h)(2) 5 Toys and other objects with a diameter of less than one and one-quarter (1 1/4) inches, objects with removable parts that have a diameter of less than one and one-quarter (11/4) inches shall not be accessible to children…
19a-79-4a(a)(1) and/or 19a-79-4a(a)(2) 4 A file shall be kept on the licensed premises for each employee of the child care center or group child care home which shall include an acceptable medical statement and a written report of a negative tuberculin test. — …
19a-79-7a(h)(2) 4 Where swings, seesaws or climbing apparatus are used, the surface in the space shall be protected with a minimum of eight (8) inches of impact absorbing materials. — 088-Impact Absorbing Material under Equipment
19a-79-7a(g)(4) and/or 19a-79-7a(h) 4 Hardware such as air conditioners, water heaters or fuse boxes shall be inaccessible to children. The playground shall be free of glass, debris, holes and other hazards. — 089-Playground Free From Hazards
19a-79-9a(b)(1) &/or 19a-79-9a(b)(2) 4 Prior to the administration of any medication, the director(s), head teacher(s), program staff or group child care home provider(s) who are responsible for administering the medications shall first be trained by a physic…

↑ Each rule code links to its CT most-cited rules breakdown — director-friendly summaries with evidence checklists.

Get the full Risk Score

Sign up to get this facility's full 0-1000 Risk Score across 8 weighted compliance components — citation history, evidence completeness, drill compliance, mock inspection scores, and more.

Unknown source cadence · Retrieved by AccreditReady May 11, 2026 · Source: Connecticut Office of Early Childhood