License #DCCC.15003 · DANBURY, CT · Capacity —
27 total deficiencies
27 citations across this facility's inspection history. Top 10 below — click any rule to read the plain-English summary, evidence inspectors look for, and how to fix.
| Rule | Times cited | Sample narrative |
|---|---|---|
19a-79-10(d)(2)(A)
|
2 | Each child care center and group child care home that serves children under three years of age shall have equipment and furniture to meet the developmental needs of the children served. Furniture shall include well const… |
19a-79-10(e)(1)(2)(3)
|
2 | The diapering area shall be an elevated sturdy table or counter equipped with a safety rail. Infants and toddlers shall be diapered at a diapering area used only for this purpose and located in the program area. Each dia… |
19a-79-7a(g)(4) and/or 19a-79-7a(h)
|
2 | Hardware such as air conditioners, water heaters or fuse boxes shall be inaccessible to children. The playground shall be free of glass, debris, holes and other hazards. — 089-Playground Free From Hazards |
19a-79-3a(e)(2)
|
2 | The operator shall post the current fire marshal certificate in a conspicuous place, accessible to the public. — 009-Current Fire Marshal Certificate |
19a-79-7a(a)(3) and/or 19a-79-7a(a)(4)
|
1 | The operator shall comply with any lead management plan established to address previous lead paint identified (indoors). — 047-Lead Management Plan Reviewed |
19a-79-7a(h)(2)
|
1 | Where swings, seesaws or climbing apparatus are used, the surface in the space shall be protected with a minimum of eight (8) inches of impact absorbing materials. — 088-Impact Absorbing Material under Equipment |
19a-79-7a(e)(5)
|
1 | Walls, ceilings, floors and rugs shall be maintained in a state of good repair and be washable or easily cleanable. — 069-Walls/Ceilings/Floors/Rugs: Clean/Good Repair |
19a-79-7a(e)(9)
|
1 | All areas accessible to children shall have light fixtures that are shielded or shatter proof. — 075-Light Fixtures Shielded/Shatter Proof |
19a-79-7a(e)(18)
|
1 | Child care centers and group child care homes that utilize combustible fuel shall be equipped with at least one (1) operable carbon monoxide (CO) detector on each occupied level of the facility. — 080-Operabl… |
19a-79-3a(c)
|
1 | The operator shall notify the Office of Early Childhood, the parent(s) and staff of any changes in programs or services. Notification of personnel changes shall be made within five (5) business days after the change. If … |
↑ Each rule code links to its CT most-cited rules breakdown — director-friendly summaries with evidence checklists.
Sign up to get this facility's full 0-1000 Risk Score across 8 weighted compliance components — citation history, evidence completeness, drill compliance, mock inspection scores, and more.
Unknown source cadence · Retrieved by AccreditReady May 11, 2026 · Source: Connecticut Office of Early Childhood