License #DCCC.13329 · WALLINGFORD, CT · Capacity —
31 total deficiencies
31 citations across this facility's inspection history. Top 10 below — click any rule to read the plain-English summary, evidence inspectors look for, and how to fix.
| Rule | Times cited | Sample narrative |
|---|---|---|
19a-79-7a
|
3 | The building, equipment and services (outdoors) shall be maintained in a good state of repair, free of chipping/peeling paint and lead paint hazards. — 090-Peeling Paint Observed |
19a-79-7a(g)(4) and/or 19a-79-7a(h)
|
3 | Hardware such as air conditioners, water heaters or fuse boxes shall be inaccessible to children. The playground shall be free of glass, debris, holes and other hazards. — 089-Playground Free From Hazards |
19a-79-6a and/or 19a-79-7a
|
2 | The building, equipment and services shall be maintained in a good state of repair. A maintenance program shall be established that ensures that the interior, exterior and grounds of the building are maintained, kept cle… |
19a-79-7a(d)(11)
|
2 | Requirements regarding toilet and washing facilities shall be satisfied. — 062-Required Toilets/Sinks/Supplies |
19a-79-7a(h)(2)
|
2 | Where swings, seesaws or climbing apparatus are used, the surface in the space shall be protected with a minimum of eight (8) inches of impact absorbing materials. — 088-Impact Absorbing Material under Equipment |
19a-79-7a(h)(5) &/or 19a-79-7a(h)(9)
|
2 | Outside equipment shall be anchored for stability. Anchors shall be buried below ground level. Outdoor equipment shall be arranged in such a way as to avoid accidents. — 092-Equipment Anchored/Safely Arranged |
19a-79-7a(a)(3) &/or 19a-79-7a(a)(4)
|
1 | The operator shall comply with any lead management plan established to address previous lead paint identified (outdoors). — 091-Lead Management Plan Reviewed |
19a-79-3a(e)(9)
|
1 | The operator shall post radon test results in a conspicuous place, accessible to the public. — 015-Radon Test |
19a-79-3a(b)(7) &/or 19a-79-4a(3)
|
1 | The operator shall be responsible for the overall management and operation of the child care center or group child care home in accordance with applicable state and local laws and regulations and shall assure annual trai… |
19a-79-3a(b)(8)(B)
|
1 | The operator shall document that the techniques used to manage child behaviors in the facility have been discussed with the child's parent(s) prior to enrollment and reviewed as needed during the period of the child's en… |
↑ Each rule code links to its CT most-cited rules breakdown — director-friendly summaries with evidence checklists.
Sign up to get this facility's full 0-1000 Risk Score across 8 weighted compliance components — citation history, evidence completeness, drill compliance, mock inspection scores, and more.
Unknown source cadence · Retrieved by AccreditReady May 11, 2026 · Source: Connecticut Office of Early Childhood