License #DCCC.13103 · SHELTON, CT · Capacity —
12 total deficiencies
12 citations across this facility's inspection history. Top 10 below — click any rule to read the plain-English summary, evidence inspectors look for, and how to fix.
| Rule | Times cited | Sample narrative |
|---|---|---|
19a-79-2a(c)(7)
|
1 | At least every two (2) years, the local health director shall make unannounced visits, inspections or investigations of the licensed child care center or group child care home. — 001-Local Health Inspection |
19a-79-3a(b)(8)(B)
|
1 | The operator shall document that the techniques used to manage child behaviors in the facility have been discussed with the child's parent(s) prior to enrollment and reviewed as needed during the period of the child's en… |
19a-79-4a(e)(2) and/or 19a-79-4a(f)
|
1 | At all times the child care center or group child care home is in operation, there shall be present at least one (1) staff member who has successfully completed within the past three years an Office of Early Childhood ap… |
19a-79-4a(h)(1) and/or 19a-79-4a(h)(2)
|
1 | A written plan for consultation services shall be developed, signed annually by the consultant and implemented. These services shall include an early childhood educational consultant, a health consultant, a dentist or de… |
19a-79-4a(h)(2)(G)
|
1 | A written plan for consultation services shall be developed, signed annually by the consultant and implemented. Consultative services shall include documenting the activities and observations in a consultation log that i… |
19a-79-7a(a)(3) and/or 19a-79-7a(a)(4)
|
1 | The operator shall comply with any lead management plan established to address previous lead paint identified (indoors). — 047-Lead Management Plan Reviewed |
19a-79-7a(e)(3)
|
1 | The water heating equipment shall deliver water at the tap, the temperature of which shall be within a range of sixty (60) degrees Fahrenheit to one hundred fifteen (115) degrees Fahrenheit. It shall have the capacity to… |
19a-79-7a(h)(2)
|
1 | Where swings, seesaws or climbing apparatus are used, the surface in the space shall be protected with a minimum of eight (8) inches of impact absorbing materials. — 088-Impact Absorbing Material under Equipment |
19a-79-7a(g)(4) and/or 19a-79-7a(h)
|
1 | Hardware such as air conditioners, water heaters or fuse boxes shall be inaccessible to children. The playground shall be free of glass, debris, holes and other hazards. — 089-Playground Free From Hazards |
19a-79-7a(a)(3) &/or 19a-79-7a(a)(4)
|
1 | The operator shall comply with any lead management plan established to address previous lead paint identified (outdoors). — 091-Lead Management Plan Reviewed |
↑ Each rule code links to its CT most-cited rules breakdown — director-friendly summaries with evidence checklists.
Sign up to get this facility's full 0-1000 Risk Score across 8 weighted compliance components — citation history, evidence completeness, drill compliance, mock inspection scores, and more.
Unknown source cadence · Retrieved by AccreditReady May 11, 2026 · Source: Connecticut Office of Early Childhood