License #DCCC.12183 · MILFORD, CT · Capacity —
67 total deficiencies
67 citations across this facility's inspection history. Top 10 below — click any rule to read the plain-English summary, evidence inspectors look for, and how to fix.
| Rule | Times cited | Sample narrative |
|---|---|---|
19a-79-7a(g)(4) and/or 19a-79-7a(h)
|
6 | Hardware such as air conditioners, water heaters or fuse boxes shall be inaccessible to children. The playground shall be free of glass, debris, holes and other hazards. — 089-Playground Free From Hazards |
19a-79-4a(h)(2)(G)
|
4 | A written plan for consultation services shall be developed, signed annually by the consultant and implemented. Consultative services shall include documenting the activities and observations in a consultation log that i… |
19a-79-3a(d)(2) thru (8) &/or19a-79-7a(d)(11)(A)
|
3 | The operator shall implement and annually review specific written policies, plans and procedures that include, but not necessarily be limited to discipline, when a child is not picked up as planned, emergencies, supervis… |
19a-79-3a(d)(1)
|
3 | The operator shall implement and annually review specific written policies, plans and procedures that include daily attendance records for both children and staff showing the specific times of arrival and departure. The … |
19a-79-7a(e)(10)
|
3 | Potentially hazardous substances in the child care centers and group child care homes shall be stored in a separate locked area. — 076-Potentially Hazardous Substances Locked |
19a-79-5a(a)(2)(A) through (E)and/or19a-79-6a(e)
|
3 | The operator of a child care center or group child care home is responsible for maintaining on the licensed premises a current record for each child enrolled. A copy of the record shall be available and provided upon req… |
19a-79-7a(h)(2)
|
3 | Where swings, seesaws or climbing apparatus are used, the surface in the space shall be protected with a minimum of eight (8) inches of impact absorbing materials. — 088-Impact Absorbing Material under Equipment |
19a-79-7a(a)(3) and/or 19a-79-7a(a)(4)
|
2 | The operator shall comply with any lead management plan established to address previous lead paint identified (indoors). — 047-Lead Management Plan Reviewed |
19a-79-3a(e)(5) and/or 19a-79-6a(a)(4)
|
2 | When a child care center or group child care home provides either meals or snacks, menus shall be prepared at least one (1) week in advance, dated and copies posted in a conspicuous place, accessible to the public. Chang… |
19a-79-7a(h)(5) &/or 19a-79-7a(h)(9)
|
2 | Outside equipment shall be anchored for stability. Anchors shall be buried below ground level. Outdoor equipment shall be arranged in such a way as to avoid accidents. — 092-Equipment Anchored/Safely Arranged |
↑ Each rule code links to its CT most-cited rules breakdown — director-friendly summaries with evidence checklists.
Sign up to get this facility's full 0-1000 Risk Score across 8 weighted compliance components — citation history, evidence completeness, drill compliance, mock inspection scores, and more.
Unknown source cadence · Retrieved by AccreditReady May 11, 2026 · Source: Connecticut Office of Early Childhood